All the mentioned work has completed in the year 2015 to 2023.
Sr. No |
Description |
Region |
Amount (PKR) |
||||
01 |
Extension of water supply scheem v/c kailag . |
haripur kpk |
100,000 |
||||
02 |
Improvement of path eidgha villag v/c kailag. |
haripur kpk |
200,000 |
||||
03 |
Boring of well 08 nos v/c kailag |
haripur kpk |
1,200,000 |
||||
04 |
Pavement of diff street v/c kailag |
haripur kpk |
600,000 |
||||
05 |
Pavement of street chacha villag v/c kailag |
haripur kpk |
600,000 |
||||
06 |
Pavement of street dhari villag v/c kailag |
haripur kpk |
600,000 |
||||
07 |
Pavement of street villag qazi mara v/c chatti dhaki |
haripur kpk |
150,000 |
||||
08 |
Construction of wall street& drain villag gorakki v/c kachi |
haripur kpk |
400,000 |
||||
09 |
Construction of path moh moora to karwali v/c karwali |
haripur kpk |
1,000,000 |
||||
10 |
Construction of path from kamal pur to rasdani v/c karwali |
haripur kpk |
1,100,000 |
||||
11 |
Construction of path near fazal rehman villag chatti v/c ternawa |
haripur kpk |
130,000 |
||||
12 |
Construction of path moh:khari villag kotala v/c pakshai |
haripur kpk |
150,000 |
||||
13 |
Water supply moh: mehani villag kotala v/c pakshai |
haripur kpk |
240,000 |
||||
14 |
Construction of rasta tammari come to soha v/c soha |
haripur kpk |
500,000 |
||||
15 |
Construction of water tank at kotla v/c soha |
haripur kpk |
400,000 |
||||
16 |
Construction of calvert diff mohs: v/c khlabut 3 |
haripur kpk |
400,000 |
||||
17 |
Pavement of graveyard boundry wall v/c chor shareef |
haripur kpk |
921,000 |
||||
18 |
Improvement of diff street v/c hattar |
haripur kpk |
1,046,000 |
||||
19 |
Pavement of main street and graveyard v/c kotnijibulla |
haripur kpk |
750,000 |
||||
20 |
Pavement of street diff v/c gramthoon |
haripur kpk |
1,350,000 |
||||
21 |
Construction of pcc road v/c bas been |
haripur kpk |
500,000 |
||||
22 |
Construction of kacha path v/c bas been |
haripur kpk |
200,000 |
||||
23 |
Construction of arif khan street v/c khalabut |
haripur kpk |
345,000 |
||||
24 |
Extention of water supply 4” dia vc malikyar |
haripur kpk |
660,000 |
||||
25 |
Construction of drain/path calvert diff moh v/c malikyar |
haripur kpk |
430,000 |
||||
26 |
Construction of link road near jahmia masjid v/c neelan butto |
haripur kpk |
265,000 |
||||
27 |
Construction of link road hariala v/c neelan butto |
haripur kpk |
200,000 |
||||
28 |
Construction of link road moh kharian v/c neelan butto |
haripur kpk |
100,000 |
||||
29 |
Construction of link road moh chammer to hariala v/c neelan butto |
haripur kpk |
100,000 |
||||
30 |
Construction of causway near girl high school kharian v/c neelan butto |
haripur kpk |
300,000 |
||||
31 |
Construction of path and calvert v/c neelan butto |
haripur kpk |
300,000 |
||||
32 |
Construction of causway v/c neelan butto |
haripur kpk |
500,000 |
||||
33 |
Construction of footpath villag abdullah pur v/c kangra |
haripur kpk |
300,000 |
||||
34 |
Repair of street khable moh ,3nos boring well 3 diff masjid v/c khalabut 4 |
haripur kpk |
900,000 |
||||
35 |
Pavement of different street v/c pandak soka |
haripur kpk |
1,022,223 |
||||
36 |
Supply and installation of generator for tube well v/c swabi mara |
haripur kpk |
1,800,000 |
||||
37 |
Path of different street v/c tofkian |
haripur kpk |
700,000 |
||||
38 |
Pavement of different street villag kamel pur v/c shadi |
haripur kpk |
600,000 |
||||
39 |
Pavement of different path street v/c julian marchabad |
haripur kpk |
730,000 |
||||
40 |
Construction of different street villag chakar (mpa raja fasil fund) v/c gram thoon |
pk 49 khanpur |
1,000,000 |
||||
41 |
Construction of different street villag hattar (mpa raja fasil fund) v/c gram thoon |
pk49 khanpur |
1,000,000 |
||||
42 |
Supply of furniture university of Haripur. |
uoh haripur |
1,008,000 |
||||
43 |
Supply of furniture university of Haripur. |
uoh haripur |
119,500 |
||||
44 |
Supply & installation of aluminum windows comsats Abbottabad |
ciit abbottabad |
117,000 |
||||
45 |
Supply of aluminum door and windows /steel cabin /falls Ceiling .comsats Abbottabad |
ciit abbottabad |
702,000 |
||||
46 |
Pcc Roads Rajdhani u/c Muslimabad |
c & w |
3,000,000 |
||||
47 |
Constrution of pre-fabicated structure of mpo cda sectore h-10 |
CdA |
9,000,000 |
||||
48 |
Improvement Of the shoulders pf park road f-8, Islamabad |
Cda |
8,000,000 |
||||
49 |
Supply of diff Mation Parts |
CDA |
4,938,804 |
||||
50 |
Supply Of dozer/excavators/roller/crank/ parts |
CDA |
4,642,560 |
||||
51 |
Construction of boundary wall around opf housing scheme chittarpari mirpur(AJK). |
OPF |
19,550,500 |
||||
52 |
Construction of boundary wall around opf housing scheme rawat. |
OPF |
17,550,800 |
||||
53 |
Construction of pcc street at u/c pind kamal khan dist haripur kpk |
Pak-pwd |
3,844,081 |
||||
54 |
Street pavement different mohallahjaat v/c darwesh haripur |
lg rdd |
1,990,000 |
||||
55 |
Sewerage line diff mohallahjaat v/c city-10 haripur |
lg rdd |
1,180,000 |
||||
56 |
BT main hattar road nazarabad haripur |
lg rdd |
1,720,000 |
||||
57 |
P/f of tuff tile in lawn RMU NTB tipu road Rawalpindi |
rmur |
3,811,000 |
||||
58 |
Construction of 4 bath room boundary wall & steel gate at fauji foundation model school basal. |
fauji foundation rawalpindi |
1,890,000 |
||||
59 |
Replacement of 2 electric water pump 71/2 hp 3 phase for tube well ffmc basal. |
FAUJI FOUNDATION RAWALPINDI |
836,000 |
||||
60 |
Civil Works in Proposed Operative care unit Fauji Foundation Rawalpindi. |
FAUJI FOUNDATION RAWALPINDI |
757,000 |
||||
61 |
Constrution Of Disaster Recovery Site at Fauji Foundation Hospital Lahore. |
FAUJI FOUNDATION RAWALPINDI |
1,155,000 |
||||
62 |
Constrution of cemented flooring of Assembly Area Includes Water Drainage System at Fauji Foundation College Kallar Kahar. |
FAUJI FOUNDATION RAWALPINDI |
2,213000 |
||||
63 |
Supply & Installation of Lift Rehab Deptt at Fauji Foundation Hospital Rawalpindi. |
fauji foundation rawalpindi |
4,305,000 |
||||
64 |
Supply & Installation Testing and Commissioning of Passenger Elevator for FUI Building DHA-1 Road Islamabad. |
FAUJI FOUNDATION RAWALPINDI |
3,610,812 |
||||
65 |
Repair/Maint of 3X Blocks/Distemper & Painting / Separation Walls at Fauji Foundation College For Girls (FFCG) New Lalazar Rawalpindi. |
FAUJI FOUNDATION RAWALPINDI |
11,090,000 |
||||
66 |
Drainage of Rain Water in front of Admin Block School Section, Check Leakage / Repair of Sui Gas Pipeline College & School Section, Maint of Gas Pipeline &New Connection for Chemistry Lab New College Bldg and Construction of Marble Slab in Bio Lab (Repair)Maint at FFCB at New Lalazar Rawalpindi. |
FAUJI FOUNDATION RAWALPINDI FAUJI FOUNDATION RAWALPINDI |
1,564,350 |
||||
67 |
Renovation of 2X Bathroom Sets of Paeds of Ward at Fauji Foundation Hospital Rawalpindi. |
FAUJI FOUNDATION RAWALPINDI |
827,534 |
||||
68 |
Repair/Maintenance of Misc,Works(Repair / Maint Fauji Foundation School Danda Shah Bilawal. |
FAUJI FOUNDATION RAWALPINDI |
1,821,998 |
||||
69 |
Construction of Emergency Exit Stairs in main Building & Kitchen for Staff at Fauji Foundation Hospital Faisalabad. |
FAUJI FOUNDATION RAWALPINDI |
1,666,500 |
||||
70 |
Distempering/ Painting and Replacement of Door/Windows Pans/Windows Grill at Fauji Foundation School New Lalazar Rawalpindi. |
FAUJI FOUNDATION RAWALPINDI |
841,395 |
||||
71 |
Uplifting/Renovation Work of Masjid of Basement is Required to be Carried out. |
FAUJI FOUNDATION RAWALPINDI |
2,118,480 |
||||
72 |
Renovation of 3x Toilet Block, Repair of Boundary Wall & Replacement of Block/Rusted Sanitation, Pipes at Fauji Foundation College Talagang-1. |
FAUJI FOUNDATION RAWALPINDI |
2,556,000 |
||||
73 |
Weather Shield/ Distemper Paint (External),Fixing of Windows Grill 1st/2nd Floor,Basement Floor polishing and repair of Drainage/ Leveling of OPD/Dr ,Washroom at Fauji Foundation Hospital Faisalabad. |
FAUJI FOUNDATION RAWALPINDI |
749,000 |
||||
74 |
Construction of Tiles work in lab Remaining Area & AD Hall at SOMH Fauji Foundation Karachi. |
FAUJI FOUNDATION RAWALPINDI |
2,282,689 |
||||
75 |
Provision of Sui Gas Finishing School & Arfa Kareem Block at Fauji Foundation College for Girls New Lalazar Rawalpindi. |
FAUJI FOUNDATION RAWALPINDI |
620,000 |
||||
76 |
Provision of Water Facility Through Turbine at Fauji Foundation School Dharyala Jalap. |
FAUJI FOUNDATION RAWALPINDI |
4,861,000 |
||||
77 |
Renovation of AD Block Washrooms & New Block Main Sewerage Pipe Line PVC (Repair/Maint Budget FY 2021-2022) at SMOH Fauji Foundation Hospital Karachi. |
FAUJI FOUNDATION RAWALPINDI |
5,681,000 |
||||
78 |
Seepage / Leakage & Misc, Works at Fauji Foundation College Building Tando Muhammad Khan .GM(WORKS)CA/75/2022/Rawalpindi. |
FAUJI FOUNDATION RAWALPINDI |
7,981,000 |
||||
79 |
Shifting of OES to-Harley Street, phase-1 (Repair and Maintenance of 3-4 Rooms of 3 Harley street, as decided on Ground to include distemper, polishing, restoration of water supply, electric supply,wiring,washroom & AC ets.) at Rawalpindi. CA NO GM(WORKS)CA/56/2022/RAWALPINDI. |
FAUJI FOUNDATION RAWALPINDI
|
1,600,000 |
||||
80 |
Shifting of OES to 3-Harley Street(phase-2)at Rawalpindi.GM(Works)CA/70/2022/Rawalpindi. |
FAUJI FOUNDATION RAWALPINDI |
10,800,000 |
||||
81 |
Extension of Boundary Wall & Construction of Main Gate at Fauji Foundation Model School Buchal Khurd. |
FAUJI FOUNDATION RAWALPINDI |
3,749,000 |
||||
82 |
Renovation Work Foundation Institute Of Technology (FIT) Sarwar Road Rawalpindi. |
FAUJI FOUNDATION RAWALPINDI |
1,624,000 |
||||
83 |
Supply & Installation , Testing & Commissioning of Publuc Address Sound Sydtem & CCTV Cameras at FFH Peshawer. |
FAUJI FOUNDATION RAWALPINDI |
7,188,000 |
||||
84 |
Face Lifting of FUI Buildings ( FUMC Academic Block, Auditorium including Cafeteria, Student Hub/Committee Rooms. Boys Hostel Phase-1 & 2, Gate Office # 01, Staff Accpmmodation 02, Animal Room 2 x Nos and Boundary Wall).(Package-II) at Foundation University Islamabad. GM(WORKS)CA/72/2022/Rawalpindi. |
FAUJI FOUNDATION RAWALPINDI |
9,300,000 |
||||
85 |
Up- Gradation of Electric Wiring All Floor Block-1 & II – Replacement of Electrical Distribution Boards (DBS) FFHO Rawalpindi. |
FAUJI FOUNDATION RAWALPINDI |
19,800,000 |
||||
86 |
Enhancement of Electrical Load from 71KW to 152KW with provision of brand new 200 KVA Transformer with allied electrical work at Fauji Foundation College for Girls (Arfa Kareem Block) New Lala Zar Rawalpindi . |
FAUJI FOUNDATION RAWALPINDI |
3,876,050 |
||||
87 |
Construction of Boundary Wall FUSST Rawalpindi, GM(Works)/CA/41/2023/Rawalpindi. |
FAUJI FOUNDATION RAWALPINDI |
2,500,000 |
||||
88 |
Renovation of Washrooms Fauji Tower Block I-II Rawalpindi. GM(Works)/CA/43/2023/Rawalpindi. |
FAUJI FOUNDATION RAWALPINDI |
31,363,000 |
||||
89 |
Construction of Security Monitoring / Vigilance Step at Fauji Foundation Hospital Rawalpindi GM(Works)/CA/01/2024/Rawalpindi. |
FAUJI FOUNDATION RAWALPINDI |
11,992,000 |
||||
90 |
Upgradation / Renovation of OPD (Re-Appropriated Capex Budget Health FY 2022-23) GM(Works)/CA/02/2024/Rawalpindi. |
FAUJI FOUNDATION RAWALPINDI |
8,163,000 |
Muabrak House # 14A, 1st Floor, Athar Street, Defence Road, New Lala Zar Rawalpindi .